The Installation And Use Of Ups Uninterruptible Power Supply

Nov 14, 2022

Leave a message

1. Package check. After opening the ups power supply box, read the manual and check if it is destroyed during the delivery link.

2. Connect the battery.

3. voltage connection. Propose to apply the battery after 6 hours of charging.

4. Link the machine equipment. Connect the keyed power cable of the equipment to the controller battery output power socket on the rear control panel of the ups power supply.

5. When turning on the ups power supply, gently press and hold the key-in switch, the display light will flash.



Send Inquiry